structured packing is critical for efficient separation in complex towers, making proper installation essential. Here are key steps to ensure optimal performance. First, thorough preparation: inspect the tower interior for debris, rust, or damage, and confirm all tower internals (e.g., support grids, liquid distributors) meet design specs. Gather necessary tools like cranes, level meters, and anti-static mats to prevent packing damage. Next, check tower alignment: verify verticality and horizontal flatness of support beams using a level. Any misalignment must be corrected to avoid packing stress or uneven liquid distribution. Clean the tower thoroughly, using approved solvents to remove residues, and dry it completely to prevent contamination. For installation, start from the bottom, carefully placing packing layers. Use lifting tools to avoid crushing or bending, and ensure each layer aligns with the tower axis, with uniform spacing. Secure layers with temporary clips if needed. After installing all layers, add top support structures (e.g., pressure rings, mist eliminators) and tighten fasteners to prevent movement. Finally, perform a pre-operation test: check for leaks, verify liquid distribution with flow tests, and confirm packing stability under pressure. By following these steps, you ensure structured packing operates efficiently, reducing downtime and improving separation results in complex tower systems.
/1 (82).jpg)
/1 (177).jpg)
/1 (54).jpg)